August 14, 2025

4130 Carbon steel pipe

4130 Carbon Steel Pipe Price 2025

For most industrial buyers in 2025, AISI/SAE 4130 (chromoly) pipe will cost substantially more than commodity mild-steel pipe because of alloy content, tighter mechanical tolerances, and finishing/heat-treatment steps. Typical finished 4130 mechanical tubing prices today range from a few hundred USD per tonne at some Chinese wholesale listings up to about $8,000–$18,000 per tonne (finished,

4130 Carbon Steel Pipe Price 2025 Read More »

1.5″ Schedule 80 pipe

1.5″ Schedule 80 pipe

1.5″ Schedule 80 pipe (nominal 1½”) is a thick-walled pipe option (OD ≈ 1.90″, wall ≈ 0.200″, ID ≈ 1.50″) commonly made in carbon steel, stainless steel, galvanized steel and PVC; it is used where higher pressure, higher mechanical strength or greater abrasion/corrosion resistance are required. For buyers who need factory-direct supply, custom lengths, and

1.5″ Schedule 80 pipe Read More »

Scroll to Top